To extend the operational life of the FPSO Haewene Brim by more than 10 years, Bluewater Energy identified the marine hydraulic system as a critical focus area. This system powers essential subsystems like ballast, bilge, cargo handling, and inert gas operations.
The existing setup was outdated, lacked diagnostic capabilities, and posed growing maintenance and reliability risks. GLO Marine was engaged to deliver a complete system redesign that would enhance reliability, maintainability, and monitoring — with the added challenge of integrating the new system during phased dry dock interventions.