Conversions

Conversion of Platform Supply Vessel

Client Confidential
Year 2020

Platform type
 Platform supply vessels 

Class
 DNV-GL

SOW
 Engineering, Class approval, On-site supervision
2
PSVs transformation

3
months project duration

1
mezzanine deck extension


1
accommodation module installed

CLIENT CONTEXT
Repurposing a PSV for new operations

GLO Marine provided engineering and class approval support for the conversion of a platform supply vessel to DNV-GL SPS (Special Personnel on board) class notation.

The vessel was repurposed from subsea support operations to general renewable energy support, with a requirement to accommodate up to 40 additional personnel in temporary living quarters. The primary engineering constraint was managing the vessel's stability under the added topside weight. The conversion also required modification of onboard systems, with particular attention to life-saving and personnel safety systems.


THE CHALLENGE
Engineering challenge

SPS class notation imposes stability and life-saving requirements beyond those applicable under standard offshore vessel codes. Meeting these requirements on an existing hull, rather than a newbuild, adds constraints not present in new construction.

Structural modifications to accommodate the new module affected vent placement and flooding boundaries, requiring coordinated input from mechanical and stability engineering disciplines. This coordination was necessary to control cost and schedule impact, including extended docking time and any resulting reduction in cargo capacity.


THE WORK TO BE DONE
Scope of work
  • Installation of a new structural accommodation module below the bridge
  • Compliance verification against SPS class notation requirements
  • Extension of the mezzanine deck
  • Class and statutory approval support
  • Modification of the existing sewage system
  • Structural calculations for a new man-overboard (MOB) boat
  • Update of life-saving appliances
  • Update of system diagrams
  • Intact stability calculation
  • Damage stability calculation
  • Inclining test procedure