BWTS RetrofittingGLO Marine’s turnkey engineering solution
Let’s start with the design costs
With our estimation tool you can find out the design & engineering cost, for all project stages (3D laser scanning & survey, class documentation and workshop drawings).
Just fill in the form on the right, and you'll receive the quotation in about 15 minutes.
Thank you!
We will send you the offer in just a few minutes. Until then, please check your email for our BWTS Brochure.
How it works
-
01
Fill in the form
By filling in the form above you will offer us the information we need to elaborate a custom offer for your BWTS installation project.
-
02
Receive the offer
Your data is processed by our efficient quotation tool, verified by an expert, and the price sent to your email right away.
-
03
Discuss with an expert
Should you need any details, our BWTS experts are available 24 / 7 to discuss the offer and scope of work.
-
04
Start the project
As soon as we make sure our proposal is right for you, we can get to work. Of course, if the offer isn’t a good fit for you, there are no strings attached.
We deliver a turnkey
engineering solution
System fit, minimum docking time and reliable engineering - these are the 3 principles that govern the installation process for BWTS.
Our extensive experience in retrofits & conversions and streamlined design workflow mean that we can deliver turnkey engineering solutions for any BWTS project, on time and in budget.
BWTS - How we work
It's meant to put the process into perspective and also give you a brief overview over our way of work and experience with different ballast water treatment systems.
Our experience
GLO Marine has been involved in more than 50 BWTS retrofit projects, helping shipowners become compliant with the latest international regulations. This experience helped us tailor our technical, planning and project management expertise accordingly, keeping projects on track, in scope and in budget.
As an independent retrofit partner, we have experience with most systems types: UV Radiation and Filtration, Electrolysis, Electro Chlorination etc, and producers: Optimarin, BIO-UV, Erma First, Alfa Laval, Ecochlor, Techcross, Hyundai, Wartsila.
-
SYSTEMS
-
BIO-SEA
-
Optimarin
-
Alfa Laval
-
Ecochlor
-
Techcross
-
Hyundai
-
-
EXPERIENCE
-
50+ BWTS projects
-
10 EGCS projects
-
-
VESSELS
-
Container vessel
-
Passenger vessel
-
Offshore Support Vessel
-
Tankers
-
Bulk Carrier
-
General Cargo
-
Mega Yacht
-
-
DEDICATED TEAM
-
2 teams for Survey &
3D Laser Scanning -
25 engineers specialized in Machinery systems & Hull
-
Our holistic approach
provides you with clarity and control
The installation of ballast water management systems needs to be done fast and in a reliable way.
Our integrated approach to design ensures clarity and efficiency over any retrofit project.
Being involved from preliminary analysis to installation supervision, we ensure that
the entire project is under control, thus offering our clients peace of mind.
-
FAST DELIVERY TIMES
-
ACCURATE 3D SCANNING & SURVEY
-
MINIMUM DOCKING TIMES
-
TURNKEY ENGINEERING SOLUTION
-
24 / 7 SUPPORT
-
COST EFFICIENT RATES
Project Phases
Click below to see the main five phases of a retrofit project.01
Technical suitability evaluation
We start with a thorough analysis of available technical documentation and operational constraints to propose the best solution for the water ballast management system, or validate the solution chosen by our client.
02
Onboard survey & 3D Laser Scanning
In phase two we perform the onboard survey and 3D laser scan. Our team collaborates with the technical superintendent on the best system positioning and routing. The resulting feasibility study is a thorough assessment of the practical issues and proposed technical solutions.
03
Basic Design Engineering
Our design team updates all P&IDs for affected piping systems, electrical diagrams and heavy equipment foundations. The drawings are sent for client review and class approval.
04
Detail Design Engineering
GLO Marine applies a holistic design system to ensure optimum pipe routing while preparing the complete design package for prefabrication and successful installation.
05
Installation support
The BWMS is installed according to the prepared plans and drawings. Given the limited amount of time available, GLO Marine offers support (supervision) during the entire installation phase, to ensure operations are performed correctly. We also liaise with the shipyard for the best outcome and on-site solutions.