Piping Prefabricates delivered for Bourbon
client
Bourbon
vessel
PSV
year
2023
SOW
Design, Procurement, Installation
-
5
Vessels
-
20t
Galvanised Pipes
-
4
Destination Yards
Client context
BOURBON, a prominent industry leader with a fleet of over 500 vessels specializing in offshore services, is known for its unwavering commitment to operational excellence.
GLO Marine has been selected by Bourbon Offshore to supply all piping prefabricates for the installation of ballast water treatment systems on board of five of their platform supply vessels.
The Challenge
GLO Marine’s success with large equipment integration proved crucial in extending this collaboration to future vessel upgrade projects related to wind propulsion systems.
The challenge of supplying 20 tons of galvanized steel pipes to four locations simultaneously in record time required exceptional logistical planning and execution.
BRIEF
The work to be done
project phases
- Supervised and inspected each prefabrication stage
- Carried out all due diligence
- Shipping 20 tonnes of galvanized steel pipes to 4 different locations
- All installations have been carried out efficiently and error-free
Testimonials
In our client’s words
”GLO Marine have been extremely proficient in the way they’ve supervised and managed
the entire process to make sure that all prefabricates are of high-quality standard and all
deliveries have reached our yards following the agreed schedule.”