- Redesign of the entire system with updated P&IDs and deck box layouts
- Development of a modular DCV stack
- Selection of standalone control architecture and UPS-backed modules
- Firmware upgrades for leakage detection
- Architecture planning and functional requirement capture
Phase 1 – Feasibility and Engineering Design