Mezzanine Deck Prefabrication

year

2023

vessel

OSV

class

DNV

ship type

OSV

  • 17t

    Mezzanine deck structure

  • 4

    weeks execution time

  • 4

    days delivery time

Client context

The project brief mandated the incorporation of a mezzanine deck on the OSV for the mobilization of diving equipment.

GLO Marine was tasked with prefabricating and delivering the mezzanine deck to the destination yard.

The Problem

The challenge in this project was that our surveyors had to closely monitor the process to ensure adherence to all design specifications and guarantee product accuracy across 3 modules

Each deck module has been prefabricated and shipped independently.

BRIEF

The work to be done

project phases

  • 17 tones of steel structure were distributed across three modules
  • Closely monitored the prefabrication stage
  • Ensure adherence to all design specifications and guarantee product accuracy
  • All relevant certificates(materials, quality, and welders) were provided to Pan Marine for validation