Mezzanine Deck Prefabrication
year
2023
vessel
OSV
class
DNV
ship type
OSV
-
17t
Mezzanine deck structure
-
4
weeks execution time
-
4
days delivery time
Client context
The project brief mandated the incorporation of a mezzanine deck on the OSV for the mobilization of diving equipment.
GLO Marine was tasked with prefabricating and delivering the mezzanine deck to the destination yard.
The Problem
The challenge in this project was that our surveyors had to closely monitor the process to ensure adherence to all design specifications and guarantee product accuracy across 3 modules
Each deck module has been prefabricated and shipped independently.
BRIEF
The work to be done
project phases
- 17 tones of steel structure were distributed across three modules
- Closely monitored the prefabrication stage
- Ensure adherence to all design specifications and guarantee product accuracy
- All relevant certificates(materials, quality, and welders) were provided to Pan Marine for validation